PROJECT HIGHLIGHT
University of Central Missouri Golf Team Building
The new Golf Team building at the University of Central Missouri (UCM) contains food services, meeting rooms, and lockers for the UCM Mules men’s and women’s golf teams. The new building covers 1,900 square feet with maximum column loads of about 50 kips.
FSGC installed a total of 33 Ductile Iron Piles to depths ranging from 12 to 29 feet (22 feet average) with minimal pile waste due to the Plug and Drive connection. An Epiroc HB2000 percussion hammer mounted on a Hitachi 345 excavator was used to install the piles at an average rate of over 800 linear feet per day. Pile load testing on the job confirmed acceptable performance, providing the project team with a well-executed and successful value engineering deep foundation solution.
Learn more about the University of Central Missouri Golf Team Building.
Project Details
Owner: University of Central Missouri
General Contractor: Reasbeck Construction
Architectural Firm: Multistudio
Structural Engineer: Bob D. Campbell & Co.
Geotechnical Engineer: Engineering Surveys and Services
DIP Design Engineer: GEOServices, LLC.
DIP Manufacturer: Duroterra