PROJECT HIGHLIGHT
Greenwood High School Freshman Center
Construction of the new Greenwood High School Freshman Center required excavation immediately adjacent to the existing High School building. Underpinning of the existing building was done first, then the excavation was accomplished in lifts as a soil nail wall was constructed.
FSGC’s role was to underpin the existing building with 37 steel piers and install 61 soil nails for for excavation support.
Project Details
Owner: Greenwood, AR Public Schools
Construction Manager: Beshears Construction
Architectural Firm: MAHG Architecture
Structural Engineer: Myers-Beatty Engineering
Geotechnical Engineer: Data Testing, Inc.
Excavation Support System Design Engineer: J. L. Burke Structural Engineering